Apply 100 mils of thermal coating to existing waste water piping while the equipment was in operation.
Reduce the surface temperature of the existing piping in operation which was a burn hazard as it was reaching temperatures of 180 degrees.
Apply a product that would allow access for maintenance, yet still offer personal protection from a present burn hazard.
Working with the existing surfaces conditions to create good adhesion for the new product.
Applying the new coating while the existing equipment was in operation.
Protecting the surrounding area and other equipment from overspray.